MANILA, Philippines — President Ferdinand Marcos Jr. on Sunday visited Tuba, Benguet to inspect a rock shed project on Camp 6 in Kennon Road.
Accompanied by Baguio City Mayor Benjamin Magalong, Marcos again expressed his dismay after seeing that the P264-million project of the Department of Public Works and Highways (DPWH), completed in November 2024, is in “precarious condition.”, This news data comes from:http://aichuwei.com
“It’s as if nothing was done,” he lamented in Filipino. “It has eroded. It eroded because the protection wall is very weak.”
“It is very low and very weak that’s why the water can seep in,” he added.
Parts of the structure’s foothold caved in when Typhoon Emong pummeled the region last July.
Marcos inspects rock shed project in Benguet

- Police general suspended for ‘obstruction’ of evidence in case of missing sabungeros
- Public Works chief to press criminal charges against Bulacan engineer
- Japan PM Ishiba bounces back in polls after election debacle
- ‘Lannie’ will bring rain showers, thunderstorms over North Luzon —Pagasa
- Marcos to attend UN meet in New York in Sept- Palace
- Heavy rain falls in parts of Southeast Asia after tropical storm blows into Vietnam Heavy rain falls in parts of Southeast Asia after tropical storm blows into Vietnam
- Sara Duterte calls DPWH flood control Inquiry a 'Zarzuela'
- President Marcos launches HD Hyundai Shipyard in Subic
- Thai cannabis-championing tycoon takes office as PM
- Rubio says US warned France on Israel annexation moves